Projects
Kombi Apartments
There is over 180 tonne of structural steel in this project. Included in this is the heavy custom fabricated steltech columns weighing 3 tonne each. The structural design also called for alot of onsite welding at the main connection points between the columns and floor beams.
Client: iLine Construction
