KiwiRail Bridge 48 - Apata

Projects

This KiwiRail Bridge 48 project was a huge challenge for the team at Jensen Steel. Having never taken on a bridge project of this sort before, it was a steep learning curve. The scale of the sections of this bridge was the most obvious hurdle among many to get over. The largest section weighed in at nearly 60 tonne, with two smaller sections weighing 25 tonne each. These were each a welded solid steel section made of a high grade weathering steel. It is credit to the experienced fabricators and management of Jensen Steel that this bridge was completed.

Once fabricated, the bridge had to be driven to site with the aid of a Jinker Trailer unit. Then on site the HEB Construction site team and Jensen Steel welders had a 24 hour window to rip out the old bridge and install the new Bridge 48, before the next train was due to roll through!

The quality standards in place regarding welding, materials and fabrication techniques were of the highest level on this project. In-fact the Bridge 48 Project was used by Jensen Steel as the Pilot Project in which they would be assessed on for ISO Standard 3834. The Quality systems in place and standard of workmanship displayed meant Jensen Steel achieved "ISO 3834 Construction Category 4", the highest level that can be accredited. Jensen Steel was one of the first two companies nation-wide to achieve this. For more info on this system, check out our “What’s Happening” page.

Gallery

KiwiRail Bridge 48 - Apata
KiwiRail Bridge 48 - Apata
KiwiRail Bridge 48 - Apata
KiwiRail Bridge 48 - Apata
KiwiRail Bridge 48 - Apata
KiwiRail Bridge 48 - Apata
KiwiRail Bridge 48 - Apata
KiwiRail Bridge 48 - Apata
KiwiRail Bridge 48 - Apata
KiwiRail Bridge 48 - Apata
KiwiRail Bridge 48 - Apata
KiwiRail Bridge 48 - Apata
KiwiRail Bridge 48 - Apata
KiwiRail Bridge 48 - Apata

Back to Top