Projects

You are Here: Projects / Health and Education / Whakatane Hospital

Whakatane Hospital

Projects

Project Waka as it was known was a large scale redevelopment of the Whakatane Hospital site run by Fletcher Construction. This project was drawn out over a long time frame in excess of 18 months. Jensen Steel would provide the steel as required on site then send the riggers and gear as needed.

Gallery

Whakatane Hospital
Whakatane Hospital
Whakatane Hospital
Whakatane Hospital
Whakatane Hospital
Whakatane Hospital
Whakatane Hospital
Whakatane Hospital
Whakatane Hospital

Back to Top