This job saw Jensen Steel race against the clock to get the roof on in time for a Super Rugby match (a roof being required to have the match under Super Rugby Rules).
The extra long trusses were stretched down the Jensen workshop, as a team of fabricators worked as fast as possible to get the fabricated piece into the Paintshop and onwards to site. As can be seen, the trusses were all lifted over the existing building by several cranes.
As always the Jensen Steel team got the job done, and the match went ahead.